日女人逼,日韩av免费在线观看,AV小网站,奶水孕妇挤胸喷奶水AV

High quality hydraulic equipment manufacturers!
TELL:+8613184968882

steel mill cylinder Sold to Estonia

Release time:2023-12-09 16:24:19 Hits: Current position: Home > News

This article mainly introduces:

Estonia hydraulic cylinder,steel mill cylinder manufacturer,steel mill cylinder

Estonia steel mill cylinder

(Estonia steel mill cylinder,produced by Hengyu Hydraulic Co., Ltd)

steel mill cylinder are widely used in Estonia,because of high work efficiency,excellent fatigue and impact resistance,no need for deceleration device.So our company has designed steel mill cylinder for customers from Estonia.

Introduction to steel mill cylinder:

steel mill cylinder piston rod material selection and technical requirements: (I), because there is no special requirements, so use 45 steel as the piston rod material, the design of the piston rod only withstand pressure stress, so no modulation processing; (ii) The coaxial tolerance of the shaft journal and the outer circle of the mounting piston is not greater than 0.01mm, so as to ensure the coaxial degree of the outer circle of the piston rod and the outer circle of the piston, and avoid the stuck phenomenon of the piston and the steel mill cylinder, the piston rod and the guide. The vertical tolerance between the end face of the mounting piston and the axis of the piston rod is not more than 0.04mm/100mm to ensure that the piston installation does not produce skew; (iii) The outer circle of the piston rod should pay attention to the roughness; (iv) Because it is operated under low load conditions, surface treatment is omitted.

Before the steel mill cylinder is removed, the relief valve should be loosened to reduce the pressure of the hydraulic circuit to zero, and then the power supply should be cut off to stop the hydraulic device. After loosening the oil port piping, the oil plug should be applied to plug the oil port.

1, the hydraulic machinery should be kept clean, in order to prevent dust and debris from falling into the oil, the tank should be sealed. 2, the oil in the tank should be replaced regularly according to the working condition. When changing the oil, the dirt and impurities accumulated at the bottom of the tank should be removed and the tank should be cleaned. 3, hydraulic oil, oil drums should be set in a clean and safe place to strengthen management. The oil drum, oil filter, oil funnel, oil pipe, etc. used should be kept clean. The oil drums for loading hydraulic oil must be cleaned in advance, and the oil drums should be dedicated and not mixed with other oil drums.

Do not regularly check the damage of the chrome layer of the steel mill cylinder: completely extend the steel mill cylinder and carefully check whether there is any surface damage such as injury, strain, welding slag, such as the surface damage position, in the steel mill cylinder block < 20cm, and the damage depth < 5mm, should be repaired in time to prevent long-term damage to the steel mill cylinder seal. Welding slag is strictly prohibited on the surface of the steel mill cylinder.

Answers to some questions about steel mill cylinder:

Two cylinders have a reversing control, if the load of the two cylinders is not the same, how to ensure their synchronization?
The piston rod of the cylinder is required to extend synchronization: install A shunt collector valve or synchronous motor at port A of the direction control valve, and then connect the two outlets of the shunt collector valve to the rod-free cavity of the two cylinders respectively. It is required that the outlet of the diverter collector valve is connected to the rod cavity of the two cylinders respectively when the piston rod is withdrawn in synchronization. The synchronization performance depends on the quality of the diverter valve and the leakage of the hydraulic system.

Why the injection cylinder retreating after the injection molding machine is started?
It is likely that the projected area of the molded plastic parts is large or the injection pressure set is relatively large, resulting in the expansion force exceeding the clamping force of the injection molding machine, so the mold is backward. You can do the following attempts: 1, reduce the injection force of the injection molding machine; 2, if the injection molding part can not be well formed by reducing the injection force, it is recommended to install the mold to a larger injection molding machine.

Back to list Recommended article

Leave a message if you have any questions.

Send
Email

Email:hsslrubbertech@gmail.com7x24 hours

Glad to receive your consultation!:

Service
Tel

+8613184968882
7x24hours service

Add
Wechat

Add Wechat
TOP
69综合| com国产www| av先锋影音| 久久亚洲综合av| 中文人妻av久久人妻18| 人妖另类xxoo| 人人白虎亚洲| 精品国产aⅴ麻豆| 午夜不卡在线| 久久久网老色批| 多人无码AV| 日本老熟妇蜜芽| www888cum| 人妻精品一区二区三区| 日本中国欧美在线观看| 午夜人人爽人人| 婷婷五月天精品| 精品视频三区| 18禁无遮挡羞羞啪啪免费网站| 爆操白虎逼| 亚洲成A人片在线播放| 亚洲精品a区aaee在线观看| 啊啊啊好爽视频| 亚洲一级、等欧美视频| 麻豆精品国产91久久久久久| 欧美日韩九区| 久久偷拍国| 中文字幕色哟哟| 亚洲色婷婷五月| 人妻插b视频一区二区三区| 啵啵视频香蕉欧美午夜| 欧美日韩久久一区二区| 2020国产精品久久精品| 性生活片二区三区| 无码精品黑人一区二区三区| 中文字幕一区二区无码| 成人亚洲电影一区二区| 欧美自拍视频| 国产一区日韩二区欧美三区| 欧洲人妻无码| 亚洲精华液一区二区三区|